Canberra's local estimating service

Fast.
Local.
Accurate.

Professional construction cost estimates delivered in 48 hours — priced on what Canberra tradies actually charge, not a national database run from overseas.

48h
Standard turnaround
on all estimates
100%
Canberra-based,
Canberra rates
$350
Starting price for
small scopes
PDF
Professional
line-by-line report

Tired of guessing
what a job will cost?

Quoting takes hours you don't have

For small builders and tradies, spending 3–4 hours putting together a quote for a job you might not even win is a losing game. That time should be on the tools, not on spreadsheets.

📍

Offshore services don't know Canberra

Generic national rate databases don't reflect what local subcontractors are actually charging right now. An estimate priced off Sydney or Melbourne rates will get you into trouble in the ACT.

💸

Budget surprises kill client relationships

When an architect presents a concept and the client later discovers the real build cost is $300k over budget, trust is broken before a sod is turned. Early cost clarity prevents this entirely.

🏦

Developers need numbers before they commit

Buying land or commissioning full documentation before you have a reliable cost indication is an expensive risk. A $700 preliminary estimate can validate or kill a $1M decision.

65%

of Australian construction projects incur a cost overrun — with the average blowout sitting between 9–20% after contracts are awarded.*

  • Only 31% of all projects completed came within 10% of their original budget (KPMG)
  • Poor cost estimation at the planning stage is the leading cause of budget blowouts
  • A 10% overrun on a $600k build is $60,000 — far more than the cost of a professional preliminary estimate
  • Early cost clarity gives builders, architects and developers the power to make decisions before they're expensive to change

*Grattan Institute / iseekplant.com.au

How ConEst works

Four steps. 48 hours. A professional PDF you can actually use.

01

Send your plans

Submit your architectural plans, project brief, or scope of works via our intake form. No plans yet? A written brief works too.

02

Quantity takeoff

We measure every item from your plans using Bluebeam — concrete, framing, roofing, finishes, services. No guesswork, no rule-of-thumb m² rates.

03

Canberra rates applied

We price every trade against a live Canberra-specific rate sheet — updated quarterly and cross-checked with current market intelligence from hands-on involvement in the local construction industry.

04

PDF delivered

You receive a professional line-by-line cost estimate as a PDF within 48 hours, complete with assumptions, exclusions, and a clear disclaimer for budgeting use.

Clear, fixed fees.
No surprises.

Every job is quoted at a fixed price. You know the cost before we start.

Small jobs

Renovations & Landscaping

$350–500

Fixed fee, per estimate

  • Renovations & extensions
  • Landscaping scopes
  • Fitouts & smaller commercial
  • PDF delivered in 48 hours

Complex jobs

Dual Occ & KDRs

$900–1,400

Fixed fee, per estimate

  • Dual occupancies
  • Knockdown rebuilds
  • Large-scale renovations
  • PDF delivered in 48 hours

Best value — Monthly retainer

Retainer Package

$1,200–1,600

Per month · up to 4 estimates

  • Up to 4 estimates per month
  • Priority turnaround — you go first
  • Custom AI agent built to your specs
  • Rates calibrated to how you build
  • Dedicated point of contact
  • Best for builders with regular pipeline
Rush fee — $200–250: Need it faster? Add a rush fee for under 24-hour turnaround. Subject to availability.

The local difference

Tired of offshore estimates that don't reflect what Canberra builders actually charge? ConEst is 100% local, 100% accurate, delivered in 48 hours.

01

Genuinely local knowledge

We're embedded in the Canberra construction industry every day. The rates we apply aren't from a national database — they reflect what ACT subcontractors and suppliers are quoting right now.

02

48-hour guaranteed turnaround

Standard industry turnaround is 5–10 business days. We deliver within 48 hours as standard — because a builder waiting on a quote is a builder who can't move forward.

03

Real construction credibility

Founded by someone who has run their own trade business, is studying construction management, and works daily inside the Canberra construction industry. We know what we're talking about.

04

Honest, preliminary positioning

We don't claim to be a registered quantity surveyor. ConEst is a fast, affordable preliminary estimating service — ideal for budgeting and feasibility before full QS documentation is warranted.

ConEst vs the alternatives

ConEst
Offshore services
Location
Canberra, ACT
Overseas
Rates used
Live ACT market
Generic national
Turnaround
48 hours
5–10 business days
Local network
Deep Canberra roots
None
Retainer option
Yes — custom AI agent
No
Rush service
Yes — <24hr available
Rarely
BV
Ben Vardy — Founder
Active in Canberra's construction industry
Construction Management, UC
Former trade business owner

Built by someone
who gets it.

I'm Ben Vardy — 20 years old, based in Canberra, and currently working inside the commercial construction industry here in the ACT. I'm also studying Construction Management at the University of Canberra.

Before this, I ran my own trade business, working alongside dozens of Canberra builders, tradies, and subbies. I know this market. I know what things cost here.

ConEst exists because I kept seeing the same problem: builders spending hours quoting, architects presenting budgets that blew up, developers guessing at feasibility. A fast, affordable, locally-accurate estimate service was the gap. So I built one.

Work with me →

Ready to get
your estimate?

Contact

🌐
Website conestau.com.au
📍
Location Canberra, ACT, Australia
48h

Standard turnaround from receiving your plans. Rush jobs under 24 hours available for an additional fee.

Request an estimate

Send through your details and we'll be in touch within a few hours.

Important disclaimer: All estimates produced by ConEst are preliminary in nature and are intended for budgeting and feasibility purposes only. They do not constitute a formal quantity survey, a contract sum, or a guarantee of final construction costs. ConEst is not a registered quantity surveyor. Actual construction costs may vary materially from any estimate provided, due to site conditions, design changes, contractor pricing, market fluctuations, and other factors beyond our control. All estimates should be verified by a licensed builder or registered quantity surveyor before financial commitments are made. ConEst accepts no liability for decisions made on the basis of a preliminary estimate alone. ABN: 19 943 763 688.